News

DK Online WTG data corrected
Many NEG Micon turbines with 48m rotor were incorrectly imported as the WindWorld variant. Please verify WTG imports performed after March 28, 2012.

..........

AFTER-EWEA-LOUNGE
In connection with the EWEA 2012 Annual Event in Copenhagen, EMD International A/S arranged a successful AFTER-EWEA-LOUNGE for around 50 WindPRO users.


The topics were:

  • WindPRO 2.8 new features and improvements, presented by Per Nielsen, General Manager, EMD International A/S

  • Site Compliance Analysis, Towards consistent, high-quality IEC 61400-1 ed. 3 (2010) site suitability assessments, presented by Lasse Svenningsen, EMD International A/S and Yvonne Käsler, TÜV SÜD

  • Wind Resource Assessment with CFD Combining WAsP, WindPRO and CFD into a unique, accurate and user-friendly CFD-solution for wind resource assessment and more, presented by Andreas Bechmann, DTU Wind Energy and Morten Lybech Thøgersen, EMD International A/S

  • New Methods in Noise Modelling Advanced noise by the NORD 2000 model and low frequency noise calculations, presented by Lars Sommer Søndergaard, DELTA Acoustics and Thomas Sørensen, EMD International A/S

We would like to thank all participants for attending and a special thanks to the external presenters.
We hope to see you all next time.

After EWEA Lounge


All presentations are published and are available here:


..........

New features in WindPRO version 2.8
Read more here

..........

WindPRO 2.8 features
In 2012 we plan to release the new version 2.8 of WindPRO. This version will contain a completely new Site Compliance module for checking turbine suitability according to IEC standards. Depending on the site complexity, users can prepare detailed site suitability analyses based on mast data or by using WAsP or WAsP Engineering V3 software as flow models in the WindPRO calculations.

WindPRO V2.8 will also include the Nord2000 noise model for advanced noise calculations. The new version will have a modernized user interface and have full integration with Google Earth. New on-line data sets will also be included in V2.8 e.g. MERRA data, which is a 30-year wind data set covering land and coastal areas for the entire globe in a much better resolution then the present NCEP/NCAR data set. In addition, V2.8 will also include the Blended Coastal Winds data set with 25 years of wind data suitable for offshore projects up to 100 km from land. Several other new features will be included in V2.8, and we hope you will enjoy working with these once V2.8 is released.


..........

Read additional WindPRO news here
Courses
WindPRO advanced Course
May 22 - 23, 2012
Barcelona, Spain
..........
WindPRO Training Course
May 22 - 24, 2012
Istanbul, Turkey
..........
WindPRO Training Course
June 6 - 8, 2012
Atlanta, GA, USA
..........
WindPRO Training Course
June 7 - 8, 2012
Paris, France
..........
WindPRO advanced Course
June 7 - 8, 2012
Atlanta, GA, USA
..........
WindPRO advanced Course
June 12 - 13, 2012
Kassel, Germany
..........
WindPRO Noise Course Course
June 12, 2012
Aalborg, Danmark
..........
WindPRO Training Course
June 14 - 15, 2012
Paris, France
..........
WindPRO Training Course
June 19 - 21, 2012
Aalborg, Denmark
..........
WindPRO advanced Course
June 26 - 27, 2012
Aalborg, Denmark
..........
WindPRO Training Course
July 3 - 5, 2012
Kassel, Germany
..........
WindPRO Training Course
July 5 - 7, 2012
Buenos Aires, Argentina
..........
WindPRO advanced Course
July 9 - 10, 2012
Buenos Aires, Argentina
..........
WindPRO Training Course
July 10 - 12, 2012
Warsaw, Poland
..........
WindPRO Training Course
September 10 - 12, 2012
Pittsburg, Pennsylvania, USA
..........
WindPRO advanced Course
September 11 - 12, 2012
Pittsburg, Pennsylvania, USA
..........
WindPRO Training Course
September 18 - 20, 2012
Barcelona, Spain
..........
WindPRO Training Course
October 2 - 4, 2012
Mexico
..........
WindPRO Training Course
October 9 - 11, 2012
Aalborg, Denmark
..........
WindPRO Training Course
October 9 - 11, 2012
Kassel, Germany
..........
WindPRO Training Course
October 18 - 19, 2012
Paris, France
..........
WindPRO advanced Course
October 23 - 24, 2012
Kassel, Germany
..........
WindPRO advanced Course
October 23 - 24, 2012
Barcelona, Spain
..........
WindPRO advanced Course
October 23 - 24, 2012
Rome, Italy
..........
WindPRO Training Course
October 24 - 26, 2012
Paris, France
..........
WindPRO Training Course
October 25, 2012
Kassel, Germany
..........
WindPRO Training Course
November 13 - 15, 2012
Kassel, Germany
..........
WindPRO Training Course
November 13 - 15, 2012
Boston, MA, USA
..........
WindPRO Training Course
November 20 - 22, 2012
Peterborough, UK
..........
Read more about WindPRO courses and registrate and read detailed location information.



Events

Please click here to see the exhibitions we are attending in 2012




Site map

EMD International A/S  Niels Jernes Vej 10  9220 Aalborg Ø Denmark  
Tel.: +45 9635 4444  Fax: +45 9635 4446  E-mail: emd@emd.dk